What demurrage means
What demurrage means in ocean freight
In container shipping, demurrage is the charge that applies when a container remains at the marine terminal after the allowed free time has expired. It is not the ocean freight rate, and it is not a customs duty. It is a time-based accessorial tied to how long the box occupies terminal space before it is gated out.
The clock, the free-time allowance, and the overtime calculation are set by the carrier and the destination (or origin) port standard for that booking—not by a single industry-wide table. A workable quote should say when free time starts, how many days are included, and who is billed if the box overstays.
On China–USA ocean moves, destination terminal time is part of landed-cost planning alongside freight, inland delivery, and entry work. See sea freight from China to the USA and the USA shipping hub for lane context. Those pages use indicative planning bands; they are not firm prices.
Demurrage vs detention
Demurrage vs detention
Demurrage and detention are often printed together on invoices, and some guides treat them as one “delay after free time” idea. Operationally they are billed for different places:
Demurrage
Usually charged while the container is still inside the terminal, after free time, until it is gated out. This is a port/terminal storage and occupancy charge.
Detention
Usually charged after the container has left the terminal, while the importer or shipper still has the equipment, until the empty (or the full export box) is returned. This is an equipment-use charge.
Both are delay charges that start after free time. If a quote or invoice uses one combined line, ask which location it covers—inside the terminal, outside with the equipment, or both. Do not assume the labels are interchangeable.
Demurrage vs THC
Demurrage is not a terminal handling charge
A terminal handling charge (THC) pays for the physical work at the terminal: lifts, yard moves, and related handling. Demurrage is a separate time-based charge after free time. Wharfage, where it applies, is a different port-use fee again. A landed-cost sheet should keep these lines distinct, even when they appear on the same arrival invoice.
These accessorials belong in the landed cost model with freight, inland, duty, and fees. Comparing an ocean rate that omits destination terminal time is not a like-for-like comparison. Mode choice between FCL and LCL also changes how cargo is handled at the terminal, which can change how delay charges arise, but it does not create a universal free-time figure.
Free time and fees
Free time and fee ranges: carrier and port standard
Indicative market-reference ranges — not SIS rates
The free-time days and daily fees below are indicative market-reference ranges taken from publicly posted ocean-carrier import tariffs (and, where stated, terminal-operator storage notices) current as of late 2026. They are not Super International Shipping commercial rates, quotations, or a promise of what any booking will be charged.
Actual free time, when the clock starts, whether weekend/holiday days count, and the fee that applies after free time all follow the booking carrier, the contract or spot terms, the destination port or terminal, and the equipment type (20', 40', 40' high-cube, 45'; dry, reefer, or special). In some markets demurrage (terminal/port dwell) and detention (equipment after gate-out) are billed separately; in others they are combined as D&D; terminal or stevedore storage may be billed on top. Confirm the tariff that applies to the booking before cargo arrives.
Illustrative published import ranges for standard dry containers (not SIS rates)
United States
Many carriers allow about 4 working days of destination demurrage free time (reefers often fewer; some ports/carriers 2–5 working days). After free time, published first-band carrier demurrage is commonly about USD 165–400 per container per day, with later bands higher and some New York / New Jersey and Florida terminals higher still. Detention is separate, often also about 4 working days free, then about USD 125–215 per container per day in the first band, escalating. The U.S. Federal Maritime Commission does not set dollar rates.
United Kingdom
Several carriers use combined demurrage and detention, commonly 5–7 calendar days free for dry import equipment, then about GBP 45–80 per day for a 20' and GBP 75–115 per day for a 40' in the first band, escalating. Terminal storage may be included, billed separately (sometimes with a shorter free period), or combined, depending on the carrier.
Australia
Carrier combined D&D or detention is commonly 7–9 calendar days free for dry import boxes, then about AUD 100–116 per day for a 20' and AUD 180–200 per day for a 40' in the first band (GST treatment follows the tariff). Port/terminal storage is usually billed separately by the stevedore and can be substantially higher after a short free-storage period.
Singapore
Published import free time varies by carrier, commonly about 3–6 calendar days, or 72 hours of terminal free storage in some notices. After free time, published first-band dry rates are often about SGD 45–50 per day for a 20' and SGD 85–90 per day for a 40' (some carriers post a higher first day of demurrage). Terminal store rent is additional; a public PSA per-day store-rent schedule was not found in this check, so this page does not publish a PSA dollar rate.
These are destination/import examples for standard dry containers. Origin or export free time is often longer in the same tariff and should not be used as the destination figure. Some official files still posted in late 2026 carry earlier (including 2024) effective dates; confirm the tariff that applies to the booking.
When you request a quote, ask for the included free time in writing, when the clock starts (for example, after discharge or after availability), and how overtime is billed if the box overstays. Without that scope, a “cheap” ocean line is not a complete destination-cost picture.
What usually causes it
What usually uses up free time
Demurrage is a result of the box still sitting at the terminal after the allowed time. Common operational causes include:
- Entry data that is late or incomplete, including ISF issues on applicable US vessel cargo, which can delay release.
- Customs or partner-government holds, exams, or document queries that keep the box in the terminal.
- Inland plans that are not ready: no trucker appointment, no warehouse receiving window, or a delivery ZIP that was never written into the booking.
- Peak-season congestion or terminal appointment scarcity, which can consume free time even when paperwork is ready.
None of those causes comes with a single published fee. The cost, if it arises, still follows the carrier and port standard on that shipment. The ranges on this page are indicative published examples, not a quotation.
How to plan for it
How to plan for demurrage before you book
1. Put free time in the quote
Ask what free time is included, when it starts, and who pays overtime. If the answer is missing, the offer is incomplete.
2. Ready the entry file early
Classification, valuation, and (on applicable US ocean moves) ISF timing belong in the pre-arrival plan, not after the vessel has already arrived.
3. Design inland against the real warehouse
Write the delivery ZIP, appointment rules, and who arranges drayage into the scope before cutoff.
4. Keep accessorials in landed cost
Model destination terminal time with freight, inland, duty, and fees. Use indicative planning bands only as a starting point; firm prices come after inquiry.
FAQ
Frequently asked questions
What does demurrage mean in shipping?
What is the difference between demurrage and detention?
Is demurrage the same as a terminal handling charge (THC)?
How many free days are included, and what is the fee after that?
How can I reduce the risk of demurrage?
Next step
Need a dated quote with free time written in?
Super International Shipping can quote China export bookings with the destination scope written down—including how free time is treated—rather than leaving terminal overtime as a surprise line. Planning figures on related pages are indicative only. Firm prices are given after inquiry.
Request a scoped freight quote
Include origin, destination, cargo details, and the must-arrive date so free time and destination charges can be addressed in the offer.
Get a freight quote